Email = ratrods1971@gmail.com

SALVAGE WAGON 'V2' BUILD

PART 4 - 2 months till Kumeu Hot Rod show to add extra bits

1 - 7/10/15 - Fitting the external oil cooler system (red pipes etc)
2 - 10/9/15 - 4 x upright exhaust - stainles internal pipes and
aluminium large external pipes wrapped in very hard mesh
and then held together with s/s buttonhead socket screws.

3 - 15/11/15 - First the framework is bent to the correct shape
4 - 15/11/15 - Exhaust mesh used for continuity and cut to size

5 - 15/11/15 - Then welded mesh into place & allow to rust
6 - 15/11/15 - Rear guards now complete for photo shoot

7 - 16/11/15 - Driver side running board with exhaust mesh used
8 - 16/11/15 - Passenger side running board with exhaust mesh used
9 - 16/11/15 - Exhaust mesh used for a 4th time on the roof rack

THE BUILD BITS & PHOTO SHOOTS


2014 = Mock up Prototype
Will it work?
2015 = 3 months till the
CRC Speedshow
2015 = Auckland Water
Front Photo Shoot
2015 = 2 months till the
Kumeu Hot Rod Show
2015 = NZ Rodder
Magazine Photo Shoot
24/7/14  to  13/9/14
25/4/15  to  9/7/15
18/10/15
7/10/15  to  20/1/16
5/12/15


THE SHOWS


CRC Speedshow
2015

VW Owners Club
Jamboree 2015
Kumeu Hot Rod
Show 2016
Orewa Hot Rod
Show 2016
BugJam 2016

CRC Speedshow
2016
Kumeu Hot Rod
Show 2017
18-19 July 2015
18 October 2015
16-17 January 2016
30 January 2016
27 February 2016
16-17 July 2016
21-22 January 2017